Work completed since 6/01/2016

The Pre-Production tasks that have been completed are as follows: 

Mise-en-scene: Completed by Taranjit with details about what the film should look like. However there aren't many pictures to show the destinations as well as the casting. 

Project Schedule: Under construction as the group hasn't talked about times in detail for the Project Schedule to be completed.

Script: Complete but needs to be printed. Mainly has the dialogue that has required. This would also include the scenery that would be expected in the extract.

Storyboard: Completed and set in folder

Shot list: Completed on two separate documents. One being the concise shots. However there are some shots that would act as back up for the film just in case there isn't much time into the film with the concise shot list. Both shot lists will be recorded though if in any way that the film will be a little short.

Action Plan

The project schedule would need to be completed so that there can be a confirmation of times and days that filming will be done. Schedule would need to at least have some work completed for it to be complete. The work would include 

Filming also needs to be completed by the end of of the month. Planned to have the filming start on 23/01/2016. However this could be sidetracked in the sense that there may be some alterations in the schedule. 

Date of Filming Completion: Approximately 02/02/2016